Q No 1: Organization can have in-house inspection, direct involvement of users and release of beta version are few of them and it also includes usability, compatibility, user acceptance etC: is called …… .
A: Task analysis
B: GUI requirement gathering
C: GUI design & implementation
D: Testing
Testing(Answer)
Q No 2: Which project is undertaken as a consequence of a specific customer request?
A: Concept development projects
B: Application enhancement projects
C: New application development projects
D: Application maintenance projects
New application development projects(Answer)
Q No 3: Requirement engineering process includes which of these steps?
A: Feasibility study
B: Requirement Gathering
C: Software Requirement specification & Validation
D: All mentioned above
All mentioned above(Answer)
Q No 4: Software safety is a quality assurance activity that focuses on hazards that may cause an entire system to fall.
A: True
B: False
True(Answer)
Q No 5: Give the disadvantages of modularization.
A: Smaller components are easier to maintain
B: Program can be divided based on functional aspects
C: Desired level of abstraction can be brought in the program
D: None of the above
None of the above(Answer)
Q No 6: Effective software project management focuses on the four P’s. What are those four P’s?
A: People, performance, payment, product
B: People, product, process, project
C: People, product, performance, project
D: All of the above.
People, product, process, project(Answer)
Q No 7: Give the Real-world factors affecting maintenance Cost.
A: As technology advances, it becomes costly to maintain old software.
B: The standard age of any software is considered up to 10 to 15 years.
C: Most maintenance engineers are newbie and use trial and error method to rectify problem.
D: All mentioned above
All mentioned above(Answer)
Q No 8: Mention any two indirect measures of product.
A: Quality
B: Efficiency
C: Accuracy
D: Both A and B
e. Both B and C
Both A and B(Answer)
Q No 9: Which testing is the re-execution of some subset of tests that have already been conducted to ensure the changes that are not propagated?
A: Unit testing
B: Regression testing
C: Integration testing
D: Thread-based testing
Regression testing(Answer)
Q No 10: State if the following are true for Project Management.ring Project Scope management, it is necessary to –
Define the scope
2) Decide its verification and control
3) Divide the project into various smaller parts for ease of management.
4) Verify the scope
A: True
B: False
True(Answer)
Q No 11: Software Requirement Specification (SRS) is also known as specification of …………….
A: White box testing
B: Acceptance testing
C: Integrated testing
D: Black box testing
Black box testing(Answer)
Q No 12: Which of the following is/are considered stakeholder in the software process?
A: Customers
B: End-users
C: Project managers
D: All of the above.
All of the above. (Answer)
Q No 13: Software components provide interfaces, which can be used to establish communication among different components.
A: Yes
B: No
Yes(Answer)
Q No 14: Which SDLC activity does the user initiates the request for a desired software product?
A: Requirement gathering
B: Implementation
C: Disposition
D: Communication
Communication(Answer)
Q No 15: In Risk management process what makes a note of all possible risks, that may occur in the project?
A: Manage
B: Monitor
C: Categorize
D: Identification
Identification(Answer)
Q No 16: What is a measure of how well a computer system facilities learning?
A: Usability
B: Functionality
C: Reliability
D: None of the above
Usability(Answer)
Q No 17: The process togather the software requirements from Client, Analyze and Document is known as …… .
A: Requirement engineering process
B: Requirement elicitation process
C: User interface requirements
D: Software system analyst
Requirement engineering process(Answer)
Q No 18: Refinement is actually a process of elaboration.
A: True
B: False
True(Answer)
Q No 19: Who manages the effects of change throughout the software process?
A: Software project tracking and control
B: Software configuration management
C: Measurement
D: Technical reviews
Software configuration management(Answer)
Q No 20: When elements of module are grouped together that are executed sequentially in order to perform a task, is called …… .
A: Procedural cohesion
B: Logical cohesion
C: Emporal cohesion
D: Co-incidental cohesion
Procedural cohesion(Answer)
Q No 21: Which coupling is also known as “Global coupling”?
A: Content coupling
B: Stamp coupling
C: Data coupling
D: Common coupling
Common coupling(Answer)
Q No 22: What is the detailed sequence of steps that describes the interaction between the user and the application?
A: Scenario scripts
B: Support classes
C: Key classes
D: Subsystems
Scenario scripts(Answer)
Q No 23: Which risks identify Potential Design, Implementation, Interface, Verification and Maintenance Problems?
A: Project risk
B: Business risk
C: Technical risk
D: Schedule risk
Technical risk(Answer)
Q No 24: Abbreviate the term BSS.
A: Box Structure Specification
B: Box Statistical Specification
C: Box Statistical System
D: Box Structure Sampling
Box Structure Specification(Answer)
Q No 25: What is the testing to ensure the WebApp properly interfaces with other applications or databases?
A: Compatibility
B: Interoperability
C: Performance
D: Security
Interoperability(Answer)
Q No 26: Which Variation control in the context of software engineering involves controlling variation?
A: Process applied
B: Resources expended
C: Product quality attributes
D: All mentioned above
All mentioned above(Answer)
Q No 27: Which classes represent data stores (e.g., a database) that will persist beyond the execution of the software?
A: Process classes
B: System classes
C: Persistent classes
D: User interface classes
Persistent classes(Answer)
Q No 28: Abbreviate the term CMMI.
A: Capability Maturity Model Integration
B: Capability Model Maturity Integration
C: Capability Maturity Model Instructions
D: Capability Model Maturity Instructions
Capability Maturity Model Integration(Answer)
Q No 29: First level of prototype is evaluated by …… .
A: Developer
B: Tester
C: User
D: System Analyst
User(Answer)
Q No 30: Which of the items listed below is not one of the software engineering layers?
A: Process
B: Manufacturing
C: Methods
D: Tools
Manufacturing(Answer)
Q No 31: Line of code(LOC) of the product comes under which type of measures?
A: Indirect measures
B: Direct measures
C: Coding
D: None of the above.
Direct measures(Answer)
Q No 32: What is the main aim of Software engineering?
A: Reliable software
B: Cost effective software
C: Reliable and cost effective software
D: None of the above
Reliable and cost effective software(Answer)
Q No 33: Choose the correct option according to the given statement.
Statement 1: Software is a physical rather than a logical system element.
Statement 2: Computer software is the product that software engineers design and builD:
Statement 3: Software is a logical rather than a physical system element.
Statement 4: Software is a set of application programs that are built by software engineers.
A: Statement 1 and 2 are correct.
B: Only Statement 2 and 3 are correct.
C: Statement 2 and 3 and 4 are correct.
D: All statements are correct
Statement 2 and 3 and 4 are correct. (Answer)
Q No 34: You are working in CareerRide as a project manager. What will you do to minimize the risk of software failure?
A: Request a large budget
B: You will increase the team size
C: Track progress
D: None of the above.
Track progress(Answer)
Q No 35: Constantine suggests four “organizational paradigms” for software engineering teams. The best project team organizational model to use when handling extremely complex problems is ………….. .
A: Random paradigm
B: Open paradigm
C: Synchronous paradigm
D: Closed paradigm
Random paradigm(Answer)
Q No 36: For the best Software model suitable for the project, in which of the phase the developers decide a roadmap for project plan?
A: Software Design
B: System Analysis
C: Coding
D: Testing
System Analysis(Answer)
Q No 37: Which of these software characteristics are used to determine the scope of a software project?
A: Only performance.
B: Only context.
C: Information objectives, function, performance
D: None of the above.
Information objectives, function, performance(Answer)
Q No 38: Which level of sub-system is used of an application?
A: Application level
B: Component level
C: Modules level
D: None of the above
Component level(Answer)
Q No 39: SDLC is not a well-defined, structured sequence of stages in software engineering to develop the intended software product.
A: True
B: False
False(Answer)
Q No 40: In the Empirical Estimation Technique which model is developed by Barry W. Boehm?
A: Putnam model
B: COCOMO
C: Both A & B
D: None of the above
COCOMO(Answer)
Q No 41: From the following select the correct option that is used to display the available option for selection.
A: Check-box
B: Text-box
C: Button
D: Radio-Button
Radio-Button(Answer)
Q No 42: CMM model in Software Engineering is a technique of …… .
A: Develop the software.
B: Improve the software process.
C: Improve the testing process.
D: All of the above.
Improve the software process. (Answer)
Q No 43: Transformers is one of the broad category used to classify operations.
A: True
B: False
False(Answer)
Q No 44: The tools that support different stages of software development life cycle are called as …… .
A: CASE Tools
B: CAME tools
C: CAQE tools
D: CARE tools
CASE Tools(Answer)
Q No 45: Which is not a step of Requirement Engineering?
A: Requirements elicitation
B: Requirements analysis
C: Requirements design
D: Requirements documentation
Requirements design(Answer)
Q No 46: Which of the level carries out goal, objective, work tasks, work products and other activities of the software process?
A: Performed
B: INCOMPLETE
C: Optimized
D: Quantitatively Managed
Performed(Answer)
Q No 47: If you have no clue of how to improve the process for the quality software which model is used?
A: A Continuous model
B: A Staged model
C: Both A & B
D: None of the above
A Staged model(Answer)
Q No 48: In Software validation, requirements can be checked against following conditions:
If they can be practically implemented
2) If they are valid and as per functionality and domain of software
3) If there are any ambiguities
4) If they are completed
A: True
B: False
True (Answer)